LBNE Internal CDR, Cost and Schedule Review

WBS 1.6 Conventional Facilities

The LBNE Project Manager has called a series of reviews, one for each of the Level 2 sub-projects (neutrino beam, near detector, water Cherenkov far detector, liquid argon far detector, conventional facilities). The purpose of these reviews is to examine the status of the Conceptual Design and the corresponding cost and schedule estimates for each of the subprojects of the Long-Baseline Neutrino Experiment (LBNE), to identify areas of weakness, and to recommend actions necessary to bring these elements to the level required for a successful DOE CD-1 review.

This review is taking place Fermilab, and the review committee (broken into two sub-committees) consists of:

  • Surface Facilities and Infrastructure: Martin Fallier (BNL) and Jason Budd (ANL)
  • Underground Excavations: Jess Albino (SLAC), Victor Kuchler (FNAL) and Mark Laurenti (Independent Consultant)

The readytalk phone number is 1-866-740-1260. The access code for each talk is listed below.

Agenda

Wednesday 3 November 2010
Start Title Speaker Room Readytalk
1-866-740-1260
08:00 Committee Executive Session West Wing (WH10NW)
Plenary
08:30 Science Goals and Requirements G. Rameika West Wing (WH10NW) 8402193
09:00 Project Overview - Near Site and Far Site T. Lundin West Wing (WH10NW) 8402193
10:00 Interface with DUSEL E. McCluskey West Wing (WH10NW) 8402193
10:15 Break
10:30 Near Site CF Requirements T. Wyman West Wing (WH10NW) 8402193
11:00 Far Site CF Requirements D. Taylor West Wing (WH10NW) 8402193
11:30 Near Site and Far Site Cost and Schedule Roll-up T. Lundin/ L. Sujan West Wing (WH10NW) 8402193
12:00 Lunch
13:00 Breakout Sessions
Session 1: Surface Facility and Infrastructure Facility Design, Costs and Schedule
Reviewers: M. Fallier, J. Budd
13:00 Far Site WCD - Buildings and Sitework B. Kaufman WH One East 8402193
13:30 Far Site WCD - Utilities Above and Below Ground S. De Vries/ J. Matthesen WH One East 8402193
14:30 Far Site WCD - Costs and Schedule B. Kaufman/ S. De Vries/ J. Matthesen WH One East 8402193
15:15 Break
15:30 Far Site LAr - Surface Facilities, Utilities and Infrastructure T. Lundin Comitium (WH2SE) 3294920
Session 2: Underground Excavations Facility Design, Costs and Schedule
Reviewers: J. Albino, V. Kuchler, M. Laurenti
14:15 Far Site LAr Facility T. Lundin The Board Room (WH5SW) 3294920
15:30 Far Site WCD Facility D. Vardiman Hornet's Nest (WH8XO) 8402193
17:00 Review Committee Closed Session Hornet's Nest (WH8XO)
17:30 Adjourn for the day
Thursday 4 November 2010
Start Title Speaker Room Readytalk
08:00 Committee Executive Session Hornet's Nest (WH8XO)
08:30 Breakout Sessions
Session 1: Surface Facilities, Infrastructure Facilities,
and Above & Below Grade Outfitting Design

Reviewers: M. Fallier, J. Budd
08:30 Near Site Buildings and Sitework T. Wyman Hornet's Nest (WH8XO) 8402193
09:00 Near Site Electrical - Above and Below Grade R. Wielgos Hornet's Nest (WH8XO) 8402193
09:45 Break
10:00 Near Site Mechanical - Above and Below Grade L. Hammond Hornet's Nest (WH8XO) 8402193
Session 2: Underground Excavations Facility Design,
Costs and Schedule

Reviewers: J. Albino, V. Kuchler, M. Laurenti
08:30 Near Site Underground Facilities T. Lundin Snake Pit (WH2NE) 3294920
Combined Session 1 and 2
11:00 Near Site Costs and Schedule for Surface Facilities,
Infrastructure Facilities, and Above & Below Grade Outfitting
T. Wyman Hornet's Nest (WH8XO) 8402193
11:30 WBS and WBS Dictionary T. Lundin Hornet's Nest (WH8XO) 8402193
12:00 Lunch
Plenary
13:00 ES&H - Near Site and Far Site M. Andrews Snake Pit (WH2NE) 8402193
13:50 Near Site Risk Register T. Wyman Snake Pit (WH2NE) 8402193
14:10 Far Site Risk Register D. Taylor Snake Pit (WH2NE) 8402193
14:30 Break
14:45 Far Site - Value Engineering Opportunities D. Taylor Snake Pit (WH2NE) 8402193
15:05 Near Site - Value Engineering Opportunities T. Wyman Snake Pit (WH2NE) 8402193
15:25 Acquisition Strategy E. McCluskey Snake Pit (WH2NE) 8402193
15:45 Review Committee Closed Session Snake Pit (WH2NE)
16:15 Questions from Review Committee Snake Pit (WH2NE)
16:45 Adjourn for the day
Friday 5 November 2010
Start Title Room Readytalk
08:00 Response to Questions Theory (WH3E)
09:00 Review Committee Report Writing (including working lunch) Theory (WH3E)
12:00 Closeout Racetrack (WH7XO)
*Please note room change*
8402193

Top of page

Conceptual Design Report Volume 6: LBNE Conventional Facilities at Fermilab

Title
Draft Conceptual Design Report, See Volume 6: Conventional Facilities at Fermilab
CDR V6 Appendix A: LBNE Near Site Conventional Facilities Requirements Document
CDR V6 Appendix B: Preliminary Geotechnical Investigation
CDR V6 Appendix C: Geotechnical Investigation Heuer Review
CDR V6 Appendix D: Preliminary Fire Protection/Life Safety Assessment
CDR V6 Appendix E: Underground Excavation/Construction Cost/Schedule Report
CDR V6 Appendix F: DOE Guiding Principles for Sustainable Design and Construction
CDR V6 Appendix G: Wetland Report
CDR V6 Appendix H: LBNE Space Bank Waiver
CDR V6 Appendix I: CF Near Site Risk Assessment
CDR V6 Appendix J: Beamline Table
CDR V6 Appendix K: Crane Schedule
CDR V6 Appendix L: LBNE Conventional Facilities CDR Drawings

Top of page

Conceptual Design Report Volume 7: LBNE Conventional Facilities at DUSEL

Title
Draft Conceptual Design Report, See Volume 7: Conventional Facilities at DUSEL
CDR V7 Appendix A: LBNE Far Site Conventional Facilities Requirements Document
CDR V7 Appendix B: Geotechnical Investigation of 4850L
CDR V7 Appendix C: SRK Assessment of 300L & 800L
CDR V7 Appendix D: Golder Associates Underground Excavation Design Report
CDR V7 Appendix E: Arup - 4850 UGL Design Report
CDR V7 Appendix F: Arup - 4850 UGI Design Report
CDR V7 Appendix G: HDR - Surface Design Report
CDR V7 Appendix H: Jacobs - LAr Cavern Design Report
CDR V7 Appendix I: CF Far Site Risk Assessment

Top of page

Other Supporting Documents

Title
Conventional Facilities WBS Dictionary
CF Near Site Cost Estimate
CF Far Site Cost Estimate
CF Near Site Schedule
CF Far Site Schedule
Draft Key Assumptions
Draft Preliminary Hazard Analysis
LBNE Organization Chart