LBNE Near Detector Complex Assessment

Charge:

In early October of 2010, the LBNE Project Manager held an internal review of the Near Detector Complex (NDC) Subproject. The review committee made several recommendations to the NDC Subproject and the LBNE Project Office. In order to assess how well the NCD has responded to the recommendations, the NDC Project Manager calls this review. While the primary purpose of the review is to assess the NDC response to the recommendations specific to the NDC, the NDC PM also invites comments on the general CD-1 readiness of the NCD Subproject.

This review is taking place at Fermilab, and the review committee consists of:

  • Steve Brice (FNAL)
  • Maury Goodman (ANL)
  • Deborah Harris (FNAL)
  • Josh Klein (Penn)
  • Stephen Pordes (FNAL)
  • Greg Sullivan (UMD)
  • Bob Svoboda (UCD)

Note: Committee attendance as listed below reflects understanding of availability; any committee member is welcome to attend any session.

Agenda

Wednesday 8 December 2010
Start Title Speaker Room
TBD Executive Session (by phone)  
Thursday 9 December 2010
Start Title Speaker/(committee) Room
13:30-14:15 Near Detector Introduction and Overview C. Mauger Comitium (WH2SE)
14:15-14:45 Measurement Strategy S. Zeller
14:45-15:30 Beamline Measurements System G. Mills
15:30-16:30 Neutrino Measurements System W. Louis
16:30-17:00 Executive Session  
17:00 Homework Assignments  
17:30-19:00 Neutrino RLS (partial committee: Goodman,
Klein, Sullivan, Svoboda)
 
Friday 10 December 2010
Start Title Speaker/(committee) Room
8:00-9:30 Beamline RLS G. Mills
(partial committee: Goodman,
Sullivan, Svoboda)
Nu's Room (WH12XO)
9:30-10:00 Responses to Homework (full committee)
10:00-11:30 Executive Session    
11:30-12:00 Closeout  
12:00 Adjourn    

Top of page

Supporting Documents

Title
Draft Conceptual Design Report, See Volume 3: The LBNE Near Detectors
Draft Preliminary Risk Assessment for the Near Detector
Draft Key Assumptions
Draft Preliminary Hazard Analysis
Near Detector Work Breakdown Structure and Resource Loaded Schedule
LBNE Organization Chart
LBNE Near Detector Requirements
LBNE Near Detector Schedule Files
Near Detector Interface Document
Near Detector Santa Fe Review Closeout/Recommendations

Top of page

Last modified: 06/28/2019 |