LBNE Internal CDR, Cost and Schedule Review

WBS 1.2 Neutrino Beamline

The LBNE Project Manager has called a series of reviews, one for each of the Level 2 sub-projects (neutrino beam, near detector, water Cherenkov far detector, liquid Argon far detector, conventional facilities). The purpose of these reviews is to examine the status of the Conceptual Design and the corresponding cost and schedule estimates for each of the subprojects of the Long-Baseline Neutrino Experiment (LBNE), to identify areas of weakness, and to recommend actions necessary to bring these elements to the level required for a successful DOE CD-1 review.

This review is taking place at Fermilab, and the review committee (broken into four subcommittees) consists of:

  • Primary Beam: Dave Johnson (Fermilab), Jim Kerby* (Fermilab) and Bob Webber (Fermilab)
  • Neutrino Beam A: Tom McManamy (ORNL) and Geoff Mills (LANL)
  • Neutrino Beam B: Phil Pile* (BNL) and Dave Puskha (Fermilab)
  • Integration and Installation: Jim Kerby (Fermilab) and Phil Pile (BNL)

*Installation and Integration subcommittee members initially join the other two subcommittees as shown on the agenda.

Agenda

Monday 20 September 2010
Start Title Speaker Room
13:00 Committee Executive Session Hornet's Nest, WH8XO
Plenary Hornet's Nest, WH8XO
13:30 Neutrino Beamline Project Overview V. Papadimitriou
14:05 WBS 1.2.2 Primary Beam S. Childress
14:35 Break
14:50 WBS 1.2.3 Neutrino Beam C.Moore
15:30 WBS 1.2.4 System Integration R. Andrews
16:00 Cost and Schedule Formats K. Domann
Breakout Session 1
1) Primary Beam Breakout Session 1;
Reviewers: Dave Johnson, Jim Kerby, Bob Webber
Snake Pit, WH2NE
16:15 Lattice Optics J. Johnstone
17:00 3D Modeling of Beamline D. Jensen
17:30 Adjourn Primary Beam Breakout
2) Neutrino Beam A and B Breakout Session 1 (joint);
Reviewers: Tom McManamy, Geoff Mills, Phil Pile, Dave Pushka
Comitium, WH2SE
16:15 Modeling - Design Issues B. Lundberg, N. Mokhov
17:00 Remote Handling - Design Issues P. Hurh
17:30 Adjourn Neutrino Beam Breakout Session 1
17:30 Committee Executive Session Comitium, WH2SE
18:00 Adjourn for the day
Tuesday 21 September 2010
Start Title Speaker Room
Breakout Session 2
1) Primary Beam Breakout Session 2;
Reviewers: Dave Johnson, Jim Kerby, Bob Webber
1 North, WH1NW
8:30 Magnets/Magnet Installation G. Velev, A. Chen
10:15 Break
10:30 Magnet Power Supplies S. Hays
11:30 Beam Loss Modeling A. Drozhdin
12:00 Lunch
2) Neutrino Beam A Breakout Session 2;
Reviewers: Tom McManamy, Geoff Mills
Penthouse, West Booster Tower
8:30 Beam Window and Baffle M. McGee
9:20 Targetry B. Zwaska
10:25 Break
10:40 Horns Y. He
11:40 Horn and Baffle Support Modules L. Bartoszek
12:00 Lunch
3) Neutrino Beam B Breakout Session 2;
Reviewers: Phil Pile, Dave Puskha
Snake Pit, WH2NE
8:30 Decay Pipe J. Misek
9:00 Decay Pipe Shielding Simulations D. Reitzner
9:15 RAW System K. Williams
10:15 Break
10:30 Tritium Mitigation R. Plunkett
11:00 Modeling - Cost and Schedule B. Lundberg
11:30 Lunch
12:00 Committee Executive Session/Working Lunch 1 North, WH1NW
Breakout Session 3
1) Primary Beam Breakout Session 3;
Reviewers: Dave Johnson, Bob Webber
1 North, WH1NW
13:30 Instrumentation M. Wendt
Reviewers: Dave Johnson, Bob Webber, Dave Pushka
14:30 LCW K. Williams
15:05 Vacuum A. Chen
15:40 End Primary Beam Breakout
2) Neutrino Beam A Breakout Session 3;
Reviewers: Tom McManamy, Geoff Mills
Penthouse, West Booster Tower
13:30 Horn Power Supplies K. Bourkland
14:20 Target Shield Pile R. Shultz
15:10 Remote Handling - Cost and Schedule P. Hurh
15:40 End Neutrino Beam A Breakout
3) Neutrino Beam B Breakout Session 3;
Reviewers: Dave Pushka
Theory 3E, WH3E
13:30 Absorber G. Velev
14:40 End Neutrino Beam B Breakout and Go to Primary Beam Breakout
4) System Integration Breakout Sessino 3;
Reviewers: Jim Kerby, Phil Pile
Comitium, WH2SE
13:30 Alignment R. Andrews
14:05 Controls G. Vogel
14:35 Interlocks C. Worel
15:05 Installation R. Andrews
16:00 End System Integration Breakout
16:00 Committee Executive Session Comitium, WH2SE
17:30 Questions from the Review Committee Hornet's Nest, WH8XO
18:30 Adjourn for the day
Wednesday 22 September 2010
Start Title Room
08:00 Answers to questions Hornet's Nest, WH8XO
09:00 Committee Executive Session/Report Writing
12:00 Committee Executive Session/Working Lunch
13:00 Closeout Report Presentation
14:00 Adjourn

Top of page

Supporting Documents

Title
Draft Conceptual Design Report, See Volume 2: The LBNE Neutrino Beamline
Draft Preliminary Risk Assessment for the Neutrino Beamline
Draft Key Assumptions
Draft Preliminary Hazard Analysis
Neutrino Beamline Work Breakdown Structure Dictionary
LBNE Organization Chart
LBNE Beamline Requirements Documents List
LBNE Beamline BOE List
Milestones for the LBNE Neutrino Beamline Sub-project