LBNE Far Site Conventional Facilities

LBNE Far Site Conceptual Design Review

WCD at 4850 Credit: Golder
LAr at 800 Credit: Golder
LAr at 4850 Credit: Golder

Far Site Conventional Facilities Subcommittee

Chair: Marty Fallier
Surface: Jeff Sims (ANL), Marty Fallier (BNL)
Underground Infrastructure: Mark Laurenti (consultant), David Taylor (Sanford)
Underground Excavation: David Jurich (Hatch Mott McDonald), Randall Essex (Hatch Mott McDonald)
Cost and schedule: Sherese Humphrey (ANL), Dave Leeb (Fermilab)

CDR Volumes 6 and 7: The LBNE Far Site Conventional Facilities

Note that three CF designs are under consideration, one each for a 200kt water Cherenkov detector at 4850L, and a 33kt liquid argon detector at 800L and at 4850L.

Volume 6 (WCD): LBNE Conventional Facilities at Sanford Lab Chapter titles (common to all three):
Volume 6 (LAr800): LBNE Conventional Facilities at Sanford Lab
 
Volume 6 (LAr4850): LBNE Conventional Facilities at Sanford Lab
Chapter 1: Introduction
Chapter 2: Existing Site Conditions
Chapter 3: The Facility Layout
Chapter 4: Surface Buildings
Chapter 5: Underground Excavation
Chapter 6: Underground Infrastructure
Chapter 7: Future Steps and Plans

CF Supporting Technical Documentation

Documents common to all design options
LBNE 1.06 WBS, WBS Dictionary Fire Protection/Life Safety Assessment by Aon
DOE Guiding Principles for Sustainable Design and Construction LBNE Acquisition Plan
CF WBS Cost Control Accounts
WCD Documents LAr at 800L (LAr800) Documents LAr at 4850L (LAr4850) Documents
Golder CDR: Excavation (WCD) Golder CDR: Excavation (LAr800) Golder CDR: Excavation (LAr4850)
Golder Excavation Drawings (WCD) Golder Excavation Drawings (LAr800) Golder Excavation Drawings (LAr4850)
Arup CDR: Infrastructure (WCD) Arup CDR: Infrastructure (LAr800) Arup CDR: Infrastructure (LAr4850)
Arup Infrastructure Drawings (WCD) Arup Infrastructure Drawings (LAr800) Arup Infrastructure Drawings (LAr4850)
HDR CDR and Drawings: Surface (WCD) HDR CDR and Drawings: Surface (LAr800) HDR CDR and Drawings: Surface (LAr4850)
MK CDR: Cost and Schedule (WCD) MK CDR: Cost and Schedule (LAr800) MK CDR: Cost and Schedule (LAr4850)
Requirements Document (WCD)
Requirements Utility Loads (WCD)
Requirements (incl. Utility Loads)
(LAr800 and 4850)
Requirements (incl. Utility Loads)
(LAr800 and 4850)
Golder In Situ Stress Report (WCD) Arup Cavern Construction Waste Handling System (LAr 800) Golder In Situ Stress Report (LAr4850)
LFA Final Geotech Report for the 4850L (WCD) LFA Final Geotech Report for the 300L (LAr800) LFA Final Geotech Report for the 4850L (LAr4850)
Large Cavity Advisory Board (LCAB) report, 4/11 (WCD)

DUSEL Preliminary Design Documents

Selected design documents; not full set

DUSEL PDR Arup Infrastructure Deliverables:
UGI Specifications (zip file)
UGI Basis of Design Report
UGI Drawings (zip file)
DUSEL PDR Golder Excavation Deliverables:
Final Report (25 Oct 2010) (zip file)
Drawings
DUSEL PDR MK Deliverable:
Cost and Schedule
DUSEL PDR HDR Deliverable:
Surface CDR Report
DUSEL LCAB Final Report

Conventional Facilities Cost and Schedule Documentation

CF Overall Project Management CF Far Site Cost Book - LAr800
CF Far Site Cost Book - WCD CF Far Site Cost Book - LAr4850